I think Central Process Scheduling from Redwood is already there and it does the same for our BW/R3/APO - mail/SMS.
Give it a look on CPS and it's based on NW Java
I think Central Process Scheduling from Redwood is already there and it does the same for our BW/R3/APO - mail/SMS.
Give it a look on CPS and it's based on NW Java