Hello Experts,
(ECC6.O,EHP6)
My client has requirement for the consumption of requirement from bottom to upper level of BOM .Suppose , FG is 'A' ,which have B and C SFGs ( Level 1) and B/C have D,E ,F (Level 2) SFGs and so on raw materials under these semi-finished goods.So the Scenerio is like that, if we do forecast for 'A' ,then system will create the dependent requirement for the LEVEL1 and LEVEL2 materials and so on..But the requiremnt is like
,
(1) If we get the demand ( S/O or STO ) for Level 2 materials ,then system should consume the Fcst independent requirements of level 1 and FG 'A'.
(Not any plan for convert A material into production order)
(2) If A is also manufacturing in three plants ,so how we can split the same FCST /PIR in between these three requirement?
Requesting you to please guide me what strategy group or requirement type/class or MRP Type or product group, need to set for fulfill these requirement.
Quick response will be appreciated....