HelloAll
I am familiar with the usage of central task list and MEBOR functionality, but I am unable to convert the operation work center when I create the order thru IW31 or change thru IW32. Tried also with MEBOR to create an order and then assign TL thru IW32 , but the work center conversion doesnt happen.
Here is what i did:
Planning plant:1118, Maint Plant: 1118 and 1105. Both maint plant assign to maint planning plant:1118.
Created a General TL with planning plant:1118, main work center 3/E and operations with work center C/E and maintenance plant:1118
Now I created a rule in MEBOR:
Main work center MWC Plant Work center Plant Validity Res.Work Center Res.Plant
* 1105 C/E 1118 01.01.2014 C/E 1105
Now as per this rule i am creating a order in maint. plant 1105 so i create a maint order with planning plant 1118, main work center 3/E and the opertaions should have main work center C/E and plant 1105 when I include this TL(in General TL the work center in operation is C/E and Plant is 1118).
After creating thru IW31/IW32 or thru WPS1, it is not resulting in conversion instead operations still have work center C/E and plant 1118 in the order.
Please instruct me where am i wrong.
Regards
Murad