Thanks Jeff for reply . As mentioned above we have a different hierarchy
structure for Cost center and responsibilty center in PCM , There exist
1: N relationship . There are four different system and every system has
there own cost center and cost element structure . In short there does
not exist harmonisation among different system .
To give exaple there is production cost center in ECC with $10000 as
value in cost element Rent . In PCM the same cost cenetr is divided in
four cost center ( Due to organisation requirement) and $10000 needs to
be divided in certain ratio can be same.
As you will agree we require tranformation to be written for allocation of
$10000 into specified ratio .
The data will come from ECC-> BODS-> PCM staging tables.
We want to know which layer should have transformation written at BODS
layer or at PCM dataload procedure or at FIM.
We are expecting voluminous data from four different system.
Regards,